Provide strategic leadership and direction for the Array Optimization Team
Develop annual operational objectives, growth strategies, and performance initiatives
Establish operational standards, best practices, and performance metrics
Operational Excellence
Oversee planning, scheduling, and execution of array-level projects
Direct multiple field crews operating across multiple states
Ensure accurate CMMS utilization and reporting standards
Team Development & Leadership
Recruit, develop, and retain high-performing personnel
Provide coaching, mentorship, and succession planning
Client & Stakeholder Management
Qualification
Extensive knowledge of PV systemsFAA Part 107 preferredOSHA 30-Hour preferredNFPA 70E preferredAbility to travel up to 30%Physical RequirementsMust have the ability to sitMust be able to lift
Required
10+ years of progressive utility-scale solar leadership experience
5+ years managing multi-state field operations
Extensive knowledge of PV systems, NEC requirements, and solar O&M practices
FAA Part 107 preferred
OSHA 30-Hour preferred
NFPA 70E preferred
Ability to travel up to 30%
Physical Requirements:
Work is performed both in a reporting setting and outdoors at various project sites across all weather conditions
Must be able to comply with all safety standards and procedures; PPE is required in all field environments
Must have the ability to sit, stoop, kneel, bend, stand, or walk for extended periods
Must be able to lift, push, or pull up to 50 pounds on an occasional basis